Sunday, April 21, 2013


Once the kitchen cabinets and countertops are in, and everything is completed, 
Abe will come back and stain/seal the floors.



Abe has gone to work on the floors this week. The plan is to extend red oak floors from the living room into the now expanded kitchen so it creates a sense of unity and flow.




Here he has "knitted" together the two floors.






The french patio doors are in! Totally top of the line Anderson doors, very, very heavy!
It took four of us guys to lift it from the front of the house to the back. 




... as Callie stands guard.





Friday, April 12, 2013


The hole in the back of the house. Once the door is in I need to either repair the cedar clapboard siding or replace all of it on the back side of the house. Between the door, and the deck the wood siding has taken a hit. 



The big revelation is that the house used to be stucco before the clapboard siding was put on. The gray area is the stucco. 


The deck took a hit as well (not that I was going to save it). So the project this summer? A new deck.



Saturday, February 9, 2013

The beams supporting the sleeping porch on the second floor; since the ceiling is open above the kitchen I took advantage of the opportunity to secure the beams using the below brackets. Just as an extra bit of security.


I finally finished "sistering" the joist beams located above the kitchen but which support the bathroom floor. Everything up to code. 




I also sandwiched three of the existing beams, as suggested by the Town of Normal inspector just to make the shower floor that much stronger and reduce/eliminate the possibility of any "bounce" while in the shower that could potentially crack the cement shower pad.


The sandwiched beams.


And, on another project, in the basement, I installed two more permanent construction grade posts (not temporary jack posts) under two beams that were butted up, but not secured to the adjoining beam. 


These two beams, along with the other beams in the basement are installed as per code and serve to not only support the beam for the first floor but level the floors in the kitchen and first floor half bath. 

Not very sexy but I can say that this house is now SOLID!


Saturday, January 26, 2013


Well, this is the latest plan I have for the upstairs bathroom. What do you think? The shower has an elliptical shape, would contain the splash of the water, no door, no threshold. Also leaves enough room for the rest of the bathroom. 



This LVL spans 15' and now the studs are gone. 
The kitchen, pantry and dining room are now one space!

 

Question: should I clad it in drywall or sand and stain?



Dining room (L), pantry (C), and kitchen (R).

From this...


... to this.



Been digging in the basement. Busted through the concrete (which is only one inch thick, resting on top of two inches of gravel. Now I can more properly support the beam in the center of the basement.






I put the dirt from the basement into the cistern ...


... only to discover I will have to buy a lot of dirt and have it filled. Very unsafe the way it is now. 












Monday, January 21, 2013



An early sketch but discarded idea of leaving the pantry and dining room walls intact by punching out a peninsula to open the space up.



I went bold:
The dining room (on the left), the kitchen (on the right) and the pantry (center top)
are now all one space.


Took these panorama shots of the new space. From the kitchen looking at the dining room on the left and the back door, soon to be french doors.



The kitchen on the left and the dining room on the right from this shot taken from 
the former pantry space. 



The dining room on the left and the kitchen on the right.


The new open space is possible because the 15' LVL will hover above the kitchen and support the second floor. The cement pier, rebar reinforced, cut into the cement basement floor will support the new LVL on the first floor. 



 

This pantry window is the single worst window in the house, so it will be replaced.




The window over the kitchen sink. Should I replace it?


The single back door will be replace by french doors leading out to the back deck.